Veichi SI23 Wiring and Setup: What to Check Before Power-Up

To commission a Veichi SI23 solar pump inverter safely without tripping faults or damaging the power stage, start with three checks before editing any parameter: isolate the PV array, ground all three circuits (PV, AC, and motor), and read the firmware version in C00.28. That third check saves hours on site. Many YouTube walkthroughs use older 6907/6908 firmware where motor specs live in group F05 and solar protections live in F14. Current 6920 boards (matching the official SI23 v1.0 manual) map motor data to F02, digital inputs to F05, and solar MPPT/pump protections to F21.

Quick installer summary: 1) Read C00.28 (6907/6908 vs 6920). 2) Keep F21.00 = 0002 for a 3-phase MPPT pump; for a single-phase motor with capacitor, wire to U and W and set F21.00 = 1002. 3) Enter exact motor nameplate specs (F02.02–F02.06) and raise recovery timers from the 10 s factory default to 300 s (5 min) to stop rapid cycling under passing clouds. 4) Always inspect fault history in group C01 before hitting reset.

1. Veichi SI23 Hardware Variants and Selection

The Veichi SI23 is a dedicated variable frequency drive with built-in MPPT for borehole, surface, and irrigation pumps. Unlike a standard VFD, it runs directly from DC solar panels and can accept backup AC power from the grid or a generator. For a broader product overview, see our Veichi SI23 overview and our note on PV+AC hybrid operation.

Our PV hybrid VFD catalog stocks three main SI23 configurations:

  • SI23-D3 (1x220 V, 1.5–3.7 kW, e.g. SI23-D3-1R5G-A, SI23-D3-2R2G-A) — for 3x220 V three-phase pumps or single-phase pumps with 1x220 V AC backup.
  • SI23-SS2 (e.g. SI23-SS2-1R5G-A) — dedicated single-phase 1x220 V pump output, 150–450 V DC PV input, up to 10 A output current.
  • SI23-D5 (3x380 V, 2.2 kW and up, e.g. SI23-D5-2R2G-A, SI23-D5-004G-A, SI23-D5-5R5G-A) — for standard 380 V three-phase pumps; high-voltage string projects can use (H) models such as SI23-D5-011G-A(H) rated up to 850 V DC PV input.

2. Firmware Check C00.28: Mapping 6907/6908 vs 6920

Both Veichi international support engineers and field installers recommend checking software version first: hold PRG to open the C00 monitoring menu and scroll to C00.28 (simplified manual, p. 41). The displayed code tells you which parameter map applies to your drive.

FunctionCurrent Firmware 6920 (Manual v1.0)Legacy Firmware 6907 / 6908EN Manual v1.0 Ref
Factory initializationF00.03 (11=except motor, 22=all, 33=clear faults)F00.19 = 1 (basic) / 2 (motor)p. 31
Lower frequency limitF01.13F00.12p. 34
ACC / DEC time 1F01.22 / F01.23F00.14 / F00.15p. 35
Motor nameplate (kW, Hz, RPM, V, A)F02.02 – F02.06F05.02 – F05.06p. 37, 141–142
Motor auto-tuningF02.07 (1=rotary, 2=static, 3=stator R)F05.20 (1 / 2)p. 37, 142
Digital inputs X1–X4F05.00 – F05.03 (X3=80, X4=81, 83=dry run)F02.00 – F02.03 (X3=80, X4=81)p. 51, 177–185
Input polarity X1–X4 (NO/NC)F05.22 (0=NO, 1=NC)F02.10 (0=NO, 1=NC)p. 54
Solar pump mode, MPPT & protectionsF21.00 – F21.28F14.xx (F14.13, F14.14, F14.16, F14.19, F14.22)p. 100–101, 309–321

All instructions below use the current 6920 firmware (v1.0 manual) codes. If your unit reads 6907 or 6908, substitute the matching code from column three.

3. Power Wiring: PV Input, AC Backup, and Pump Motor

Never touch the power terminals until the DC breaker is open or the PV fuse is pulled. Even under overcast skies, a PV string produces lethal DC voltage that can destroy the input board on accidental contact.

Reading left to right along the bottom power block, SI23 terminals are: PV-, PV+, PE (PV ground), AC input R/L, S, T/N, motor output U, V, W, and PE (motor ground).

  1. Wire PV negative first, then PV positive. Experienced installers terminate PV- before PV+ and always verify DC polarity with a multimeter before tightening the lugs.
  2. AC backup input. For single-phase 220 V AC, connect Live to R/L and Neutral to T/N, leaving S empty. Three-phase D5 (380 V) models use R, S, and T. When PV and AC are wired for hybrid switching, digital input function 82 (Hybrid mode) is documented on p. 185 of the EN manual.
  3. Ground every circuit. Bond the PV frame, AC earth, and motor earth to proper PE terminals. Without grounding, lightning surges or static buildup on long borehole cables discharge straight through the drive.
  4. Check rotation before lowering the pump. Tug-test every terminal screw and run a brief surface rotation check (keeping wet submersible pumps submerged in a test drum or checking motor rotation before coupling the hydraulic end) before lowering the assembly into the borehole.

4. Single-Phase Pump Wiring: With vs Without Capacitor

The Veichi SI23 drives single-phase motors in two distinct modes depending on whether the start/run capacitor stays connected. Both methods are verified against VEICHI Tech Academy's official guide and the F21.00 section of the EN manual (p. 309–310).

Option A: Single-phase motor with capacitor (2-wire output)

When the capacitor remains inside the pump or control box, connect the two motor leads to U and W and leave V unconnected. Set the thousands digit (LED3) of F21.00 to 1 — i.e. 1002 for MPPT mode.

Per the official manual (p. 309, 311), this macro automatically adjusts the V/F curve (the printed v1.0 PDF cites F08.00 = 5, though in 6920 firmware V/F curve selection is F04.00 — no manual edit is needed), disables output phase-loss trip in the ones digit of F10.20 = 0, raises low-frequency protection F21.14 = 30 Hz, and sets its auto-recovery delay F21.16 = 300 s.

Option B: Single-phase motor without capacitor (3-wire output)

When the capacitor is removed and all three winding leads are accessible, wire U to the secondary (start) winding, V to the common (public) terminal, and W to the main (run) winding. Set F21.00 = 2002.

On newer SI23 firmware (demonstrated by VEICHI Tech Academy; not yet printed in the early v1.0 PDF), automatic winding identification is available: after setting F21.00 = 2002, set F02.07 = 3 (or 1/2) and press RUN. The drive saves the detected winding order into F02.69 (0–5), while the secondary-to-main voltage ratio is tuned in F21.64 (default 1.10).

5. Core Motor Parameters and MPPT Timers

Enter the motor nameplate first, confirm MPPT mode, and extend protection recovery delays. The 10-second factory defaults work only on a test bench — in real solar installations under passing clouds they cause relentless start-stop cycling.

Parameter (fw 6920)FunctionRecommended ValueWhy Change It
F02.02 – F02.06Motor kW, Hz, RPM, voltage, currentExact motor nameplateSets thermal protection and current-limit baseline (EN manual, p. 37, 141–142)
F21.00Solar pump drive mode (4 digits)0002 (3ph MPPT) / 1002 (1ph w/ cap) / 2002 (1ph no cap)Enables MPPT and motor macro (p. 100, 309)
F01.13Lower frequency limit25–33 Hz (match pump curve)Below ~30 Hz most borehole pumps stop lifting water and overheat (p. 34)
F21.13Sleep stop restore wait time300.0 s (default 10.0 s)Prevents rapid cycling at dawn or during cloud cover (p. 101, 314)
F21.14 / F21.16Low-speed trip frequency & restore wait30–33 Hz / 300.0 sTriggers A.LFr on weak sun and waits 5 min before retry (p. 315)
F21.17 – F21.19Dry-run detect current, time & restore waitNo-load current + 10–15% / 10 s / 300.0 sSensorless dry-run trip A.LuT; 0.0 A disables it (p. 316–317)
F21.20 / F21.22Pump overcurrent trip & restore waitPer pump spec / 300.0 sTriggers A.Old on jammed impeller or sand lock (p. 318)
F01.22 / F01.23ACC / DEC time 110–20 s (increase on E.oC2/E.oL2)Reduces water hammer and current spikes (p. 35)

Field observation: in hot-climate installs shown by Cedar Pumps, some installers derate 220 V motor voltage to 200 V and add 10% current margin. Follow the official manual by entering exact nameplate ratings first; only derate if measured site voltage consistently sags under load.

6. Tank Float and Borehole Dry-Run Sensor Wiring

A physical float switch in the storage tank or a probe in the borehole is more reliable than current-only dry-run detection (F21.17). SI23 handles level switches on terminals X3, X4, and COM.

  • Input assignments (EN manual v1.0, p. 51, 185): default F05.02 = 80 (X3 = water-full upper limit, alarm A.FuL), F05.03 = 81 (X4 = water-full recovery lower limit). For a dedicated external borehole dry-run sensor, assign function 83 (Dry running input) to a free X terminal and enable the thousands digit (LED3) of F21.29 (p. 185, 322).
  • Single two-wire sensor wiring: bridge X3 and X4 with a short jumper, connect one sensor wire to COM and the other to X4 (dry-contact sensors are non-polarized).
  • NO / NC logic (F05.22, p. 54): digits map from right to left as X1, X2, X3, X4. Set 0 for active-when-closed (NO) or 1 for active-when-open (NC). For NC operation on X3 and X4, set F05.22 = 1100 (legacy fw 6908: F02.10 = 1100).
  • Wet bucket test: submerge the sensor in water and press RUN — the pump should ramp to 50 Hz. Pull the sensor out: after the configured delay (F21.27 for tank full or F21.18 for dry run), the drive must stop and display the matching alarm code.

7. Veichi SI23 Fault and Alarm Codes: Step-by-Step Diagnostics

Veichi's international support team stresses one rule before clearing any trip: never reset blindly. Open monitoring group C01 (manual p. 42) and log five values at the moment of trip: fault type (C01.00), output frequency (C01.02), output current (C01.04), DC bus voltage (C01.05), and module temperature (C01.06). The last three fault records remain stored in C01.10–C01.23.

CodeMeaning (Manual p. 24–27)Common Field CausesVerification & Fix
E.oC1Overcurrent during accelerationACC time too short, excessive V/F torque boost, starting a spinning pumpIncrease F01.22, check V/F (F04.00–F04.01), wait for full stop before restart
E.oC2Overcurrent during decelerationDEC time too short, output/ground short circuit, motor auto-tuning not runIncrease F01.23 (fw 6908: F00.15) to 20–30 s; disconnect U/V/W motor leads and test no-load; for intermittent trips run F00.03 = 11 (or 22)
E.oC3Overcurrent at constant speedJammed pump impeller (sand/silt), output short, motor cable >50 m without output choke, undersized inverterInspect pump for mechanical binding and megger-test cable insulation; add a motor reactor if cable exceeds 50 m; verify SI23 current rating
E.oL1 / E.oL2Motor overload (oL1) / Drive overload (oL2)Excessive hydraulic load, wrong motor parameters, phase current imbalance, short ACC/DECMeasure all 3 output phases with a clamp meter and compare with C00.02; run auto-tuning F02.07 = 1 or 2 (fw 6908: F05.20); lengthen F01.22/F01.23
E.SCSystem abnormal / output shortMotor phase-to-ground fault, output short, damaged IGBT moduleDisconnect motor cable and check winding/ground insulation; if E.SC persists with no motor wired, contact service
A.LPn / A.LU1Dormancy low PV voltage (LPn) / Low DC bus (LU1)Heavy clouds, shading, too few panels in seriesCheck Voc in C04.15 and thresholds F21.11–F21.13
A.LFrLow frequency protectionInsufficient solar power to stay above F21.14Normal cloud response; review F21.14–F21.16 or expand PV array
A.LuTDry run protectionPump current dropped below F21.17 — borehole water depletedCheck borehole yield and calibrate F21.17–F21.19
A.OldPump overcurrent protectionCurrent exceeded F21.20 threshold (silting or mechanical binding)Check pump hydraulics and tune F21.20–F21.22
A.FuLWater full protectionUpper tank float tripped on terminal X3 (function 80)Normal tank-full stop; tune delays in F21.27–F21.28

For deeper IGBT multimeter checks and power-stage diagnostics across Veichi drives, see our Veichi VFD fault code guide and Veichi VFD setup walkthrough.

8. Common Field Mistakes to Avoid

  • Copying video parameters without checking C00.28. Entering motor data into F05 on 6920 firmware overwrites digital input functions X1–X4.
  • Leaving 10-second defaults in F21.13 / F21.16 / F21.19. Boreholes do not recharge in 10 seconds and cloud edges last longer — short delays hammer the pump.
  • Ignoring borehole cable length. Runs over 50 meters generate capacitive leakage currents that trigger E.oC3 unless a motor reactor is fitted (see VFD accessories and chokes).
  • Forgetting F21.00 on single-phase pumps. Without F21.00 = 1002 (or 2002), the open V terminal trips output phase-loss fault E.oLF.

9. Sources and Technical Verification

All parameters, terminal numbers, and fault codes were verified against official Veichi documentation. If your unit runs a firmware revision other than 6907/6908 or 6920, verify the group map via C00.28 and the supplied manual.

Choosing the Right SI23 for Your Pump

Our catalog offers Veichi SI23 solar pump inverters (in stock and to order) from 1.5 kW to industrial capacities (D3, SS2, D5, and high-voltage H versions up to 850 V DC) alongside compatible solar panels. Browse our solar pump inverters catalog or reach out to our engineers to size your PV string and verify commissioning settings before startup.

⚡

Need a variable frequency drive for your motor?

We'll find the right solution by power, voltage and load type

Browse catalog Consultation

Поширені запитання

Veichi SI23 ships with two firmware branches — check C00.28 first. Firmware 6907/6908 puts motor data in F05 and solar protections in F14, while current 6920 firmware (v1.0 manual) puts motor specs in F02.02–F02.06, digital inputs in F05, and solar MPPT protections in F21.