Skip to content

Zelio Logic: Programming, Wiring and PLC Differences

Zelio Logic: what it is and where we use it instead of a PLC

Zelio Logic is a family of programmable smart relays from Schneider Electric (SR2 and SR3 series) for simple discrete automation: lighting, a float-controlled pump, ventilation, a gate, a basic conveyor. One DIN-rail housing, a built-in display, front-panel buttons, 10 to 26 I/O points per unit (up to 40 with SR3 extension modules). It is a typical choice when a panel needs several timer relays and a dozen interposing relays replaced and a full PLC with an HMI looks like overkill.

Our catalog includes SR2 and SR3 units plus expansion and communication modules. Below: how they are built, how the program is written, how to wire them, and where the line is after which you need a PLC.

SR2 vs SR3: the difference and which one to pick

SR2 is a self-contained compact unit with no expansion; SR3 is a modular relay you can extend. Both are programmed the same way in the same Zelio Soft 2, so the choice comes down to whether you will run out of ports.

  • SR2: 10, 12 or 20 I/O in one housing, no expansion; supply 12 V DC, 24 V DC, 24 V AC or 100–240 V AC (limits 85–264 V) depending on the suffix in the part number (JD, BD, B, FU).
  • SR3: base units with 10 or 26 I/O, up to 40 I/O in total with extension modules (discrete SR3XT61BD with 6 I/O and SR3XT141BD with 14 I/O); Modbus and Ethernet communication modules are available.
  • Letters in the part number (Schneider naming, e.g. SR2A101BD, SR2B121BD, SR2D101BD, SR2E201BD on se.com): A means a display without a clock, B a display and a clock, D neither, E a clock without a display, then the I/O count, and the supply voltage at the end. For example, SR2B121BD is 12 I/O, clock, display and 24 V DC supply.
ModelI/OSupplyNotes
SR2B121BD1224 V DCclock, display, compact housing
SR2B201FU20100–240 V AC (limits 85–264 V)clock, display, mains-powered
SR3B261BD2624 V DCmodular, clock, display, 10 relay outputs

A rule from practice: if the project will not grow, take a 20-point SR2. If there is a chance of a couple more sensors next year, or you need Modbus or Ethernet, go straight to SR3. Replacing the housing later costs more than adding a module such as the 14-point SR3XT141BD.

Extension modules are either discrete or analog. The discrete SR3XT141BD adds 14 I/O. The analog SR3XT43BD (10-bit) adds 2 analog inputs, 0-10 V / 0-20 mA, and 2 analog outputs, 0-10 V; the second input (IJ) can also be set up for a Pt100 probe. With this module only the FBD language is available in Zelio Soft 2.

What the SR3B261BD datasheet actually says

SR3B261BD has 26 I/O: 16 inputs and 10 relay outputs on a 24 V DC supply; 6 of the 16 inputs (IB...IG) can work as analog. The numbers below come from the Schneider Electric datasheet for this part number. Source: Schneider, Product data sheet SR3B261BD, https://chastotnik.ua/manuals-sr3_datasheet_en. Also: Schneider, SR3 Programming Guide, pp. 327-328, 329, 333-335, https://chastotnik.ua/manuals-sr3_programming_en.

  • Supply: 24 V DC, permitted range 19.2-30 V, reverse polarity protection. Supply current up to 190 mA without extensions and up to 300 mA with extensions.
  • Discrete inputs: 24 V DC, about 4 mA per input; 3-wire PNP proximity sensors are supported. Counting frequency on a discrete input is 1 kHz.
  • Analog inputs: six inputs IB...IG, the datasheet lists the range as 0...10 V / 0...24 V without explaining the modes (treat it as 0-10 V for analog use), 8-bit resolution, about 5% error at 25 °C. The same terminals take NTC 10k, KTY81 and Pt 500 temperature probes.
  • Relay outputs: 10 contacts rated 24-250 V AC or 5-30 V DC; 8 outputs at 8 A and 2 outputs at 5 A.
  • Program: up to 500 lines in FBD or up to 240 lines in ladder, cycle time 6-90 ms, clock backup 10 years.

An 8-bit analog input means a step of about 39 mV. That is enough for a float sensor or a pressure switch, not for precise PID temperature control. This is where we would start thinking about a PLC. The base SR3B261BD takes 0-10 V only: a 0-20 mA current signal needs the SR3XT43BD analog module.

Wiring Zelio Logic: supply, inputs, outputs

Supply and fuse first, then inputs, then outputs; check that the supply voltage matches the label on the housing. A 24 V DC relay connected to 230 V mains dies instantly.

  1. Supply: feed the unit through a 1 A quick-blow fuse or a circuit breaker. On DC versions watch polarity (there is protection, but do not count on it).
  2. Discrete inputs: on DC versions, buttons and contacts connect between the supply + and the input. A 3-wire PNP sensor takes the same 24 V, and its signal wire goes to the input. The NPN vs PNP difference is covered in connecting a sensor to a PLC.
  3. Analog inputs: screened cable only, up to 10 m between stations, and the sensor is not isolated. Which inputs are analog depends on the model: IB...IG on SR2B201BD and SR3B26xxD, only IB and IC on SR2A201BD and SR2D201BD, IB...IE on SR3B10xBD.
  4. Relay outputs: inductive loads (contactors, relays, solenoids) need suppression: a diode across a DC coil, an RC snubber on AC. An 8 A thermal rating does not mean you can hang a motor on the contact: per the datasheet, at 230 V AC-15 it is rated only 0.9 A. Switch motors through a contactor only.
  5. Terminals: screw terminals, 0.2-2.5 mm2 wire, tightening torque 0.5 N·m.

On contact life. According to Schneider, one relay output lasts 500,000 cycles at 230 V AC-15 and 0.9 A, and 10 million cycles mechanically. So a relay output is not suitable for switching every few seconds; the contacts wear out quickly. Use transistor outputs or solid-state relays for that.

Programming in Zelio Soft 2

Zelio Logic is programmed in the free Zelio Soft 2 software in two languages: ladder (LD) and function block diagram (FBD). The program goes from the PC to the relay over the SR2USB01 USB cable. Zelio Soft 2 is free: it can be downloaded from the ESR2SFT01 page on se.com (Software and Firmware, V5.4.3). The Schneider catalog also lists the SR2CBL01 cable for a COM port and the SR2BTC01 Bluetooth interface; ask a manager about their availability. The SR3NET01BD Ethernet module for SR3 gives remote monitoring and control over Ethernet (Modbus/TCP). It is also server-only (a Modbus service on TCP port 502, FBD required), so Zelio is not a Modbus master with either this module or the SR3MBU01BD.

  • LD: convenient if you are used to reading relay and contactor schematics. You draw contacts, coils and timers.
  • FBD: gives more room for logic: timers, counters, comparators and the clock as connected blocks. We usually use FBD for anything beyond a couple of rungs.
  • Simulation: you can run the program on the PC without a relay: toggle inputs with the mouse, vary the analog voltage, watch the outputs. There is also a monitoring mode on a live relay.

Practical advice: simulate first, download second. A bug in a 10-minute timer is unpleasant to find in the panel on a running machine; the simulator lets you speed up time and see it in a minute.

Typical workflow

  1. Write an I/O table (what goes on which channel).
  2. Draw the logic in Zelio Soft 2 and check it in the simulator.
  3. Connect the relay to the PC with the cable and download the program.
  4. Test in monitoring mode with the actuators disconnected, and only then apply power.

Zelio Logic vs a PLC: where the line is

Zelio Logic covers simple jobs up to 40 I/O with modest logic; you need a PLC once analog count, fast counters, networks and PID loops grow. It is not better or worse, just a different tool.

CriterionZelio Logic SR2/SR3Small PLC
I/OSR2: 10, 12 or 20 (no expansion); SR3: 10 or 26 base, up to 40 with modulesexpandable by dozens of modules
Programup to 500 lines FBD / 240 ladderdepends on the series and controller memory
Analog8-bit 0-10 V on the base; 10-bit 0-10 V / 0-20 mA with SR3XT43BDusually higher resolution and a current-input option
LanguagesLD, FBDdepends on the series; many PLCs support the IEC 61131-3 languages
NetworksModbus, Ethernet (SR3 modules)Modbus, Ethernet, CAN, industrial buses
HMIbuilt-in display and buttonsseparate panel

A Zelio is tied to a VFD simply: a dry relay contact to a VFD digital input (run/stop), and with the SR3XT43BD also a 0-10 V signal to the VFD analog frequency-reference input. It does not poll a VFD over Modbus: the SR3MBU01BD module works only as a Modbus slave. See the Veichi and Delta VFD ranges.

A PLC having more memory and more languages does not mean it makes sense everywhere. For porch lighting, dosing or a simple dry-run pump control, a Zelio relay is cheaper and quicker to set up. Once the project gets VFDs, an HMI and full SCADA, read how to choose a PLC, the IEC 61131-3 languages and how a PLC, VFD and HMI work together. For I/O growth on a PLC see the expansion modules guide. Small-PLC series we carry: Delta, Veichi, Fatek.

Frequently Asked Questions

What is the difference between SR2 and SR3?

SR2 is a compact unit with 10, 12 or 20 I/O and no expansion; SR3 is a modular relay: a 10 or 26 I/O base plus extension modules up to 40 I/O and Modbus and Ethernet communication modules. Both are programmed the same way in Zelio Soft 2.

What software programs Zelio Logic?

Zelio Soft 2 from Schneider Electric, in ladder (LD) and FBD. The software is free: it can be downloaded from the ESR2SFT01 page on se.com (Software and Firmware, V5.4.3). Connect from a PC with the SR2USB01 USB cable; the Schneider catalog also lists the SR2CBL01 (COM port) cable and the SR2BTC01 Bluetooth interface, so ask a manager about their availability.

How many inputs and outputs does Zelio Logic have?

SR2 has 10, 12 or 20 I/O, SR3 has 10 or 26, and with extension modules up to 40. For example, SR3B261BD has 26 I/O: 16 inputs and 10 relay outputs, and 6 of the 16 inputs (IB...IG) can work as analog (0-10 V).

Can I connect a 4-20 mA sensor to Zelio Logic?

Yes, but not on the base SR3B261BD: its analog inputs work in the 0-10 V range only. The SR3XT43BD extension module adds two analog inputs, 0-10 V / 0-20 mA (10-bit), so a 4-20 mA sensor connects to an SR3 with this module and no converter. SR2 compact units cannot be expanded: they need an external signal converter or a sensor with a 0-10 V output.

Can I switch a motor directly from a Zelio relay output?

No. The thermal rating is 5-8 A, but at 230 V AC-15 it is only 0.9 A, so motor inrush current will wear the contacts out quickly. Switch the motor through a contactor and let the Zelio relay drive the contactor coil.

Conclusion

If the job fits in 10-40 I/O and the logic in about fifty lines, Zelio Logic gets it done faster and cheaper than a PLC. To start, look at SR2 relays and modular SR3, and for a wider range of controllers see PLCs. The brand overall: Schneider Electric in Ukraine. Send the list of inputs and outputs and the supply voltage via contacts: we will reply with the price and availability of the exact part number.

⚡

Need a variable frequency drive for your motor?

We'll find the right solution by power, voltage and load type

Browse catalog Consultation

Поширені запитання

SR2 is a compact unit with 10, 12 or 20 I/O and no expansion; SR3 is a modular relay: a 10 or 26 I/O base plus extension modules up to 40 I/O and Modbus and Ethernet communication modules. Both are programmed the same way in Zelio Soft 2.