Project Objectives:
Increase safety and precision of crane operations.
Optimize speed and smoothness of movement.
Reduce wear and tear of mechanisms.
Automate control processes.
Ensure reliable and continuous crane operation.
Implementation Stages:
- System Analysis: Study of electrical diagram, mechanism specs, control requirements.
- Technical Design: Select Veichi equipment, develop wiring diagram, program PLC and HMI.
- Installation: Install drives, PLCs, operator panels, sensors, cabling.
- Commissioning: Configure drives, set parameters, test system modes, calibrate sensors.
- Startup: Train staff, provide documentation.
System Features:
- Soft start and stop of crane mechanisms
- Precise load positioning
- Automatic speed control
- Overload and fault protection
- Real-time parameter display on HMI
- Remote monitoring and control
- Equipment diagnostics
Expected Results:
- Improved safety and reliability
- Increased crane productivity
- Reduced maintenance costs
- Better working conditions for operators
Used Equipment:
- Veichi AC310 frequency inverters
- Veichi PLC controllers
- Veichi HMI operator panel
- Position, speed, and load sensors
- Communication equipment: Ethernet, Modbus