Project Goals
- Increase production efficiency and output.
- Reduce product cost by process optimization.
- Improve product quality and consistency.
- Reduce human factor influence.
- Enhance workplace safety.
Implementation
- Development and deployment of an automated process control system.
- Integration of Veichi equipment: VFDs, PLCs, operator panels.
- Automation of dosing, mixing, granulation, drying processes.
- Monitoring temperature, pressure, speed, level.
- Data visualization and analysis.
- Fault diagnostics and prevention.
Project Stages
- Process analysis and automation points identification.
- Veichi equipment selection and configuration.
- PLC and HMI software development.
- Installation, testing, personnel training.
Expected Results
- +15–20% increase in productivity.
- -10–15% reduction in production cost.
- Fewer failures, stable product quality.
Used Equipment
- Veichi frequency drives (VFDs).
- Veichi PLCs.
- Veichi operator panels.